Support / Case
Application cases Page 2
Compare representative home, pet, office and hospitality deployments by model, environment and operating workflow.
Model library
12
Page 2 of 2
Showing 10-12 of 12 application cases
12 cases
Industrial application
R1 ProLight manufacturing facility, approx. 2,100 sqm
Scheduled cleaning for a mixed-use production floor
- Challenge
- Fixed equipment and changing pallet positions make manual sweeping difficult to repeat consistently.
- Deployment
- Primary aisles were mapped with restricted equipment zones and an after-shift cleaning window.
- Outcome
- The team gains a documented route that can be checked and adjusted as production layouts change.
Industrial application
R1 MaxWarehouse and dispatch area, approx. 3,600 sqm
High-capacity coverage for a logistics floor
- Challenge
- Dust and packaging fragments accumulate along high-traffic lanes between dispatch cycles.
- Deployment
- The route focuses on main lanes, staging areas and controlled edge zones during a fixed overnight window.
- Outcome
- A larger dock and battery capacity reduce interruptions, while the route remains tied to documented shift boundaries.
Industrial application
R1 FleetIndustrial campus, two buildings and approx. 5,200 sqm
Multi-unit pilot for a facility campus
- Challenge
- The facilities team needed a repeatable way to compare machine coverage and service workload before expanding.
- Deployment
- One building was used as a pilot with route assignments, dock cycles and operator exceptions recorded in the dashboard.
- Outcome
- Expansion decisions can be based on measured coverage, intervention frequency and service planning rather than assumptions.